Dake Elecdraulic - 905 series Instrukcja Użytkownika

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Ekwipunek Dake Elecdraulic - 905 series. Dake Elecdraulic - 905 series User Manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 15
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 0
Model 5-025, 5-050, 5-075 & 5-150
1
INSTRUCTIONS AND PARTS LIST FOR
Models 5-025, 5-050, 5-075, and 5-150
Elec-Draulic I Presses
WARNING LABELS
To the left is the safety Alert symbol. When you see these safety alert symbols on your press,
be alert to the potential for personal injury.
Follow recommended precautions and safe operating practices.
SETTING UP THE PRESS FOR OPERATION
For shipping convenience some of the parts are not assembled. Assemble these parts in the following order:
1. Bolt the base angles to uprights using four bolts and nuts, which are provided. Make sure base
angles are against stops on uprights.
NOTE: The press should set on a level floor with the base angles touching the floor at all
points. Use shims where necessary.
2. Motor starter box is mounted on left upright. Have electrician connect power to motor starter. Pump
can rotate in either direction.
3. Oil Requirements: Fill reservoir thru street elbow at back of press with Mobil DTE oil No. 24 or
equivalent. NOTE: Oil level may be checked (with ram up) by removing the 1/8” NPT pipe plug
on the right side of reservoir near the front. Replace plug before operating the press.
Model 5-025 uses 6 quarts
Model 5-050 uses 8 quarts
Model 5-075 uses 10 quarts
Model 5-150 uses 20 quarts
4. Prime pump by removing the plug in the top of the pump opposite the intake line and allow the oil
levels in the reservoir and pump to equalize. Fill pump with additional oil (if required), replace plug
making sure seal is tight, and start motor.
5. Attach nose piece to ram by inserting shank into ram and tightening the set screw.
CAUTION! Place the hoist crank on the lift drum shaft. Turn the hoist crank to relieve
the pressure on the table pins. Keeping tension on the hoist crank, remove the table pins one
at a time. After removing the tables pins, turn the crank running the table channels from top to
bottom. Check to make sure the cable is tracking correctly. The cable should be on each of
the two upper pulleys and should track back and forth on the cable drum. Always place table
pins under the table channels before releasing the hoist crank when positioning the table
channels for cable tracking, servicing, or set-up for desired work opening. If a tracking
problem exists, contact the Dake factory for instructions. Be sure all table pins are fully
inserted in place before applying pressure. Always remove or release pressure on the cable
before pressure is applied.
OPERATIONS
WARNING: DO NOT OVERSTROKE THE RAM. Overstroking will cause premature seal failure.
Models 5-025, 5-050, & 5-075 have a 10-inch stroke. Model 5-150 has a 16-inch stroke.
The press has been completely tested at the factory and after setting up according to instructions above, the
press is ready for operation. However, it is necessary for the operator to acquaint themselves with the
controls.
1. Three screws (item 100) are used to lock the workhead in the desired position along head
channels.
2. The handcrank (item 19) is provided to raise or lower the table channels to the proper work height.
When desired height is obtained insert the table pins. Models 5-025 and 5-050 use 2 pins on each
side (4 total) and Models 5-075 and 5-150 use 3 pins on each side (6 total).
Przeglądanie stron 0
1 2 3 4 5 6 ... 14 15

Podsumowanie treści

Strona 1 - Elec-Draulic I Presses

Model 5-025, 5-050, 5-075 & 5-150 1 INSTRUCTIONS AND PARTS LIST FOR Models 5-025, 5-050, 5-075, and 5-150 Elec-Draulic I Presses WARNING LABELS

Strona 2

Model 5-025, 5-050, 5-075 & 5-150 10 Item Part Name Model 5-025 Model 5-050 Model 5-075 Model 5-150 Qty 48 Stroke indicator rod 2260 2260

Strona 3

Model 5-025, 5-050, 5-075 & 5-150 11 Item Part Name Model 5-025 Model 5-050 Model 5-075 Model 5-150 Qty 92 Neoprene washer 2248 2248 2248

Strona 4

Model 5-025, 5-050, 5-075 & 5-150 12 INSTRUCTIONS AND PARTS LIST FOR Models 50-101 ¾ GPM Hydraulic Pump Variable volume – stem control I. DE

Strona 5

Model 5-025, 5-050, 5-075 & 5-150 13 Trained Dake personnel with complete rebuilding and testing facilities permit rapid overhaul and testing, res

Strona 6

Model 5-025, 5-050, 5-075 & 5-150 14

Strona 7

Model 5-025, 5-050, 5-075 & 5-150 15 ITEM QTY DESCRIPTION MAT’L PART NUMBERS 50-101 A 1 Pump Shaft HRS 25110 B 1 Key CRS 300449 C 2 Oi

Strona 8 - Eductor Block Exploded View

Model 5-025, 5-050, 5-075 & 5-150 2 CAUTION: Be sure ALL table pins are in place an in as far as they can go before pressure is applied.

Strona 9 - Figure 1

Model 5-025, 5-050, 5-075 & 5-150 3 3. If nothing happens when press is operated. a. If motor does not run, the electrical circuit should be inv

Strona 10 - Serial No. > 192523

Model 5-025, 5-050, 5-075 & 5-150 4 WARNING LABELS To the left is the safety Alert symbol. When you see these safety alert symbols on your press,

Strona 11

Model 5-025, 5-050, 5-075 & 5-150 5 Electrical Diagram

Strona 12 - Models 50-101

Model 5-025, 5-050, 5-075 & 5-150 6

Strona 13

Model 5-025, 5-050, 5-075 & 5-150 7

Strona 14

Model 5-025, 5-050, 5-075 & 5-150 8 Eductor Block Exploded View

Strona 15

Model 5-025, 5-050, 5-075 & 5-150 9 Item Part Name Model 5-025 Model 5-050 Model 5-075 Model 5-150 Qty 1 Pulley 602 602 727 1563 2 2 F

Komentarze do niniejszej Instrukcji

Brak uwag